Independent, documented engineering monitoring of construction and finishing works in Syria, for property owners living abroad.

  • A report every two weeks
  • Dated photos and video
  • Supervised by a licensed engineering office
Get a free quote or message us on Messenger Three steps, under two minutes. We reply within 24 hours.

Starting in Damascus and Rif Dimashq, with other governorates coming soon. Or message us on Instagram

“How's the work going?”

The question every owner abroad asks about the building or flat back home

You transfer the payment and wait for news. You get “all good” and a few photos taken from a distance. You can't tell whether the waterproofing was done properly before it was covered, or whether the tiles are the ones you chose.

We send an engineer to your site who is independent of your contractor. They inspect, photograph from the same angles every visit, compare the work with what you agreed, and send you a signed report in plain language.

So when you ask “how's the work going?”, the answer comes with photos and dates. Rest easy: the work is راكز وماكن, solid and steady.

What you usually get

  • “Everything's fine” on the phone
  • Photos with no date or location
  • You find the problem after the wall is closed
  • Everyone tells a different story

What you get from us

  • A signed report after every visit
  • Dated photos and video from the same angles
  • Issues raised before work is covered, with the correct method
  • A clear issue log, tracked until every item is closed
Living room at the baseline visitBaseline visit · 2 July
Living room at visit 2, after first-fix servicesVisit 2 · 30 July
Living room at visit 4, after plasteringVisit 4 · 27 August
The same angle at every visit, so you can see the progress yourself. Photo position P1, living room. Illustrative sample – fictional data
How it works

From your first message to handover

  1. Request a quote

    Fill in the quote form or message us. Tell us where the property is, what kind of work it is, who the contractor is, and when the work started or will start.

  2. Baseline visit

    The engineer records the condition of the site, fixes the specification and a simple schedule, and sets fixed photo positions.

    Within 5 working days
  3. Regular inspections

    Site inspection, check points for each work item, progress, and issues discussed with the contractor on site.

    Every 2 weeks or monthly
  4. Signed report

    Signed by the engineer and the partner office, with a short English summary on Messenger and your own photo archive.

    Within 48 hours
  5. Handover

    A final inspection, a handover report and a complete photo record. We keep your archive for 12 months.

The engineer photographing plumbing during an inspectionIllustrative sample

“We monitor and give technical direction. We don't manage your contractor.”

The engineer gives the contractor technical notes and direction on quality and workmanship, and every instruction is recorded in the report. Quantities, prices, timing and payments remain your decisions.

Finishing works

What we check on site

Plumbing

A documented pressure test before the walls are closed.

Electrical

Boxes at a consistent level, cables to specification, and earthing.

Waterproofing

Bathrooms and kitchen, with a 48-hour flood test recorded in photos.

Plastering

Checked with a straightedge and square, and tapped for hollow spots.

Floors and tiling

Tiles match the approved sample; levels and falls are correct.

Ceilings and gypsum

Straight edges, and light openings where the drawings show them.

Aluminium and windows

Profiles and double glazing as quoted, and sealed installation.

Painting

Filler, primer and two coats, before the kitchen and doors go in.

What you receive

A report you understand from the first page

Reports are issued in Arabic, the language used on site and with your contractor. If you prefer English, we send you an English summary of every report on Messenger.

نموذج توضيحي
راكز وماكن RM-2026-000
ROM-RPT-2026-D04

تقرير الكشف الدوري رقم ٤

شقة سكنية – المزة، دمشق · تاريخ الكشف ٢٧ آب ٢٠٢٦ · بيانات افتراضية

خلاصة التقرير

في ملاحظات لازم تتابعها

  • العزل منتهٍ، لكن اختبار الغمر غير موثّق.
  • جزء من لياسة غرفة النوم الرئيسية منفصل.
  • دفعة البلاط الواردة لا تطابق العيّنة المعتمدة.

نسب الإنجاز حسب بنود العمل

البندالمخططالفعليالحالة
تمديدات صحية وكهرباء١٠٠٪١٠٠٪منتهٍ
تدفئة وتكييف١٠٠٪١٠٠٪منتهٍ
عزل١٠٠٪١٠٠٪منتهٍ
لياسة١٠٠٪٨٥٪معرّض للتأخير
أرضيات وبلاط١٠٪٠٪معرّض للتأخير
مطلوب منك قبل ١٠ أيلول: قرار بشأن دفعة البلاط. الصياغة المقترحة للمتعهد مرفقة في التقرير.

الصور حسب نقاط التصوير الثابتة – P3 الحمام الرئيسي

التفاصيل الكاملة بالتقرير

Sample report page in Arabic, with fictional data.

  • Report summaryOne line on where the work stands, plus the three points that matter most.
  • Progress by work itemPlanned against actual for each item, and any item at risk of delay.
  • Three photos per positionBaseline, previous visit and today, from the same angle and dated.
  • Issue logWhat is wrong, the correct method, the direction given to the contractor and their response.
  • Materials against your specificationWhether the materials delivered match what you chose.
  • “Action needed from you”The decisions you need to make, with ready-to-send wording for your contractor.
  • Project photo archiveAll photos and video in a private folder you open with your own Google account.
Download sample page 1 (PDF, Arabic) Illustrative sample with fictional data

And this is how it reaches you on Messenger

Rakez o MakenMessenger Illustrative sample
Hi, how's the work going on site?
30 July · 6:15 pm
Hello Mr S., here is the visit 2 report for the Mazzeh flat.
Summary: the work is on track.
Plumbing and electrical first fix are nearly complete and the pressure test passed. Two minor issues; the contractor will fix them before plastering. Nothing needed from you this time.
PDFVisit 2 report – signed6 pages · 14 dated photos
Packages

Choose how close you want to be to your site

Pricing will be published soon. Starting in Damascus and Rif Dimashq.

Core package

Site monitoring

An engineer's eye on your site, and a signed report after every visit.

  • Baseline visit, specification and a simple schedule
  • An inspection every two weeks, or monthly
  • Signed report within 48 hours, with a Messenger summary
  • One urgent visit with every 6 regular inspections
  • Project photo archive for 12 months after handover
To be announcedMonthly, paid in advance
Contracted with our partner office

Full engineering supervision

When you want an engineer to sign off each stage before work continues.

  • Review of construction drawings and approval of materials
  • Site supervision and acceptance of each work item
  • Required testing (laboratory costs paid by the owner)
  • Regular reports and a final report
Per projectDirect contract with the partner office
Coming soon

Property inspection

One engineering inspection and a report, before you decide.

  • Before buying a property
  • Before accepting a flat from the developer
  • For a rented or vacant property
To be announcedOne-off inspection

Want a proposal for your site?

Fill in the form in under two minutes and we'll reply within 24 hours. Free, with no obligation.
Get a free quote

Starting in Damascus and Rif Dimashq, with other governorates coming soon. Property elsewhere? Leave your details and we'll add you to the waiting list for your city.

Who inspects your site

Engineers from a partner engineering office in Damascus

We work with a partner engineering office in Damascus specialising in architecture, interiors and finishing works.

  • Our partner's experience spans residential, medical and heritage projects in Damascus, Rif Dimashq and the Gulf.
  • Experience in restoring and rehabilitating traditional Damascene houses.
  • Practical knowledge of construction drawings and materials approval.

How we assure report quality

  1. Every report is signed by the responsible engineer and endorsed by the partner office.
  2. Every report is reviewed by Rakez o Maken before it reaches you.
  3. The same photo positions at every visit, so you can see the difference yourself.
  4. The engineer handles no money or materials and has no side arrangement with the contractor.
FAQ

Common questions

What is the difference between site monitoring and full supervision?

With monitoring, the engineer inspects the site every two weeks or monthly, records what they find, compares it with your specification and gives the contractor technical direction on quality. With full supervision, the partner office signs off every work item, approves materials and carries out testing, and you contract with them directly.

Does the engineer talk to the contractor?

Yes. They give notes and technical direction on quality and workmanship, and every instruction is recorded in the report with the contractor's response. Quantities, prices, timing and payments remain your decisions. We monitor and give technical direction; we don't manage your contractor.

What language are the reports in?

Reports are issued in Arabic, the language used on site and with your contractor. If you prefer English, we send an English summary of each report on Messenger and answer your questions in English.

How do I see the photos and video?

The report reaches you on Messenger with a short summary. Photos and video sit in a private archive for your project on Google Drive, which you open with your own Google account. We keep the archive for 12 months after handover and give you a month's notice so you can download it.

What happens if the engineer finds a serious problem?

We tell you about any safety or structural issue on the day of the visit, without waiting for the report.

Who lets the engineer onto the site?

You arrange access: a key, or the contractor being present on working days. You also let the contractor know that an engineer will visit regularly.

How do I pay?

A monthly subscription, paid online in advance. You can pause or stop with 7 days' notice.

Do you work outside Damascus?

For now we cover Damascus and Rif Dimashq, and we are preparing other governorates. Leave your details and we'll add you to the waiting list for your city.

Do you design, price work or find contractors?

No. We don't design, prepare bills of quantities or cost estimates, find contractors or hold any money. If you need design or full supervision, we can put you in touch with our partner office.

Get a quote

Tell us about your site

Three short steps, under two minutes. We reply within 24 hours with a clear proposal.

  • We reply in English, on the channel you choose
  • Your details are seen only by the Rakez o Maken team
  • No obligation: the proposal is free

Where is the property?

What kind of work?

An owner abroad reading the inspection report on his phone
Illustrative image

How's the work going? Ask us.

Tell us about your site and we'll come back with a clear proposal, free and with no obligation.

[email protected]@rakezomaken
Get a free quote